Loading...
Work contract for evacuation, removal and transportation of ash accumulated inside silo of PH-II, 2X600 MW, SSTPP, MPPGCL, Dongalia.
| Category | Parameter | Value |
|---|---|---|
| Dummy Data | Dummy Data | Dummy Data |
| Dummy Data | Dummy Data | Dummy Data |
| Dummy Data | Dummy Data | Dummy Data |
TRANSPORTATION OF BULK PETROLEUM PRODUCTS BY TOP LOADING TANK TRUCKS Ex. MughalsaraiTerminal
EXPRESSION OF INTEREST OF EQUIPMENT FOR SETTING UP A 2MWh CELL FABRICATION LINE FOR CYLINDRICAL AND PRISMATIC CELLS SUPPLY, INSTALLATION, COMMISSIONING, DEMONSTRATION, TESTING, TRAINING OF 2MWH CELL FABRICATION LINE