Loading...
Construction of las toilet at 1st Floor and repair, renovation of Superintending Engineer ,Assistant Engineer HQ room and toilet, sinking of tubewell with Drinking Water Purification Plant and allied works at the Office of the EE,MSD DIVISION,PHE
| Category | Parameter | Value |
|---|---|---|
| Dummy Data | Dummy Data | Dummy Data |
| Dummy Data | Dummy Data | Dummy Data |
| Dummy Data | Dummy Data | Dummy Data |
IRSP-Rehabilitation of M/s Cummins model KTAA19G10 CPCB-II Make DA set fitted in high capacitive power car in Mumbai Central division.
Supply, Erection, Testing & Commissioning of 220/132/55 KV Traction Substation, Sectioning post (SPs), Sub sectioning post (SSPs) in 2 x 25 KV Traction System (Scott Connected Transformer) of Daund- Pophlaj Sections of Central Railway, to meet 3000 MT loading target on EPC Mode