This tender involves replacing approximately 96.90 circuit kilometers of 132 KV lines with High Temperature Low Strain (HTLS) conductor, including design, manufacturing, testing, and supply of the conductor along with necessary hardware and accessories.
| Category | Parameter | Value |
|---|---|---|
| Dummy Data | Dummy Data | Dummy Data |
| Dummy Data | Dummy Data | Dummy Data |
| Dummy Data | Dummy Data | Dummy Data |
Replacement of existing old aged deteriorated 132KV porcelain disc insulators( YOC:1955) with new 132kV 120kN Antifog disc insulators at all suspension towers (34 Nos) and with 132kV 120kN SRC insulators at all tension towers (11Nos) from Loc. No. 22 to 66 in 132kV Machkund - Araku DC line under RMI scheme in OM Circle Visakhapatnam
The tender involves repairing and maintaining a damaged 33 KV cable network near 255 Transit Camp, including fault detection, localization, and rectification under the GE (U) Electric Supply Delhi Cantonment.