SW-1: BZA Div. - Repairs to GODAVARI Bridge - Filling up of scour around Pier Nos. 1 to 30 of Bridge Nos. 248A with Tetrapod blocks, Precast CC blocks and Stone boulders, Provision of steps to GODAVARI River and construction of Ballast retainers. (Sanction ID No. 11.06.32.25.3.55.032) Sw-2:BZA Div. - Repairs to GODAVARI Bridge - Filling up of scour around Pier Nos. 1 to 30 of Bridge Nos. 248 with Tetrapod blocks, Precast CC blocks and Stone boulders. (Sanction ID No. 11.06.32.25.3.55.033) SW-3:BZA Div. - Repairs to Thandava Bridge - Filling up of scour around Pier Nos. 1 to 3 of Bridge No. 544 ( Thandava) and Pier no.s 1 to 5 of Bridge No.703 (Saradha) with Tetrapod blocks, Precast CC blocks and Stone boulders, Provision of steps from Thandava River and construction of Ballast retainers in SSE/Works/TUNI Section under ADEN/TUNI Sub Division (Sanction ID No. 11.06.32.25.3.55.034)
| Category | Parameter | Value |
|---|---|---|
| Dummy Data | Dummy Data | Dummy Data |
| Dummy Data | Dummy Data | Dummy Data |
| Dummy Data | Dummy Data | Dummy Data |
The tender involves deploying an excavator, loader, and tractor with a trolley to remove slips and debris from unlined drains and clear roadside drains during rainy seasons in Khad Sub Division. This project aims to restore road conditions affected by rain damage.
The project involves restoring rain-damaged link roads to Harijan Basti Beetan, Mohalla Kutta, Bhadrian to Jongpur, and Gondpur to Jaichand. This work aims to repair sections from Km 0/00 to 1/300, 0/00 to 1/300, 0/00 to 0/750, and 0/00 to 0/750 respectively, under the civil works category.