Loading...
The project involves installing fire hydrants, automatic sprinklers, terrace piping, addressable fire detection and alarm systems, and public addressable and signage systems at the Causality Building (G+2) and other specified locations.
| Category | Parameter | Value |
|---|---|---|
| Dummy Data | Dummy Data | Dummy Data |
| Dummy Data | Dummy Data | Dummy Data |
| Dummy Data | Dummy Data | Dummy Data |
Supply and installation of Fire Safety System (list of items enclosed)
5 Amp, SP Miniature Circuit Breaker (MCB), C Curve