Shifting of Filtration machine,Transformer Oil Tank Shifting,Arrangement of dry air or N2,Dismantling and assembly of HV LV links Jumpers etc,Draining and refilling of transformer oil,Attending Oil Leakage,Replacement of gasket of all inspection cover,Replacement of gasket of oil pipeline and PRV,Filtration of Transformer Oil,Servicing of OLTC mech,Air venting and tightness,Servicing of marshalling Box,Cleaning of Transformer,Complete Testing of 30MVA ST 1 2,Painting of 30MVA ST 1 2 and associated equipment
| Category | Parameter | Value |
|---|---|---|
| Dummy Data | Dummy Data | Dummy Data |
| Dummy Data | Dummy Data | Dummy Data |
| Dummy Data | Dummy Data | Dummy Data |
PRIMARY VOLTAGE TRANSFORMER
Set of inner labyrinth (NDE) for 3 phase TM type -6FRA6068 consisting following two items- i) Inner labyrinth NDE C&D No-5720/201, Qty-01 No/set & ii) Inner labyrinth NDE C&D No-5780/005, Qty-01 no/set. Specification/Drg No-As per CLW Drg No-4TWD.096.042, Alt-7 with latest & 4TWD.096.031, Alt-6 with latest, Specn no 4TMS.096.068, Rev-2, Alt-1 with latest, STR No- RDSO/2007/EL/STR/0021 Rev-1 with latest