Loading...
This tender involves the shifting and re-erection of high tension (HT), low tension (LT), and substation facilities as part of the Karatali PMGSY road project from 0/000 Km. to 7/440 Km., excluding 3/550 Km. to 6/550 Km., to accommodate road strengthening.
| Category | Parameter | Value |
|---|---|---|
| Dummy Data | Dummy Data | Dummy Data |
| Dummy Data | Dummy Data | Dummy Data |
| Dummy Data | Dummy Data | Dummy Data |
Contact wire parallel clamp
ELECTRICAL WORK IN SUB STORE HALL