Loading...
Requirement of M/s Capco Water Solutions Pvt. Ltd. Make spares of CW and Raw water chlorination system of FY 2026-27 installed at 2 X660 MW CSCTPP, Chhabra.
| Category | Parameter | Value |
|---|---|---|
| Dummy Data | Dummy Data | Dummy Data |
| Dummy Data | Dummy Data | Dummy Data |
| Dummy Data | Dummy Data | Dummy Data |
TRANSPORTATION OF BULK PETROLEUM PRODUCTS BY TOP LOADING TANK TRUCKS Ex. MughalsaraiTerminal
EXPRESSION OF INTEREST OF EQUIPMENT FOR SETTING UP A 2MWh CELL FABRICATION LINE FOR CYLINDRICAL AND PRISMATIC CELLS SUPPLY, INSTALLATION, COMMISSIONING, DEMONSTRATION, TESTING, TRAINING OF 2MWH CELL FABRICATION LINE