Loading...
Replacement of&#x0d defective/faulty equipment at existing Capacitor bank (22KV,7.2MVAr) and bring back&#x0d the entire Capacitor bank into service in the existing Marapalam 110/22-11KV Sub-&#x0d Station in Puducherry
| Category | Parameter | Value |
|---|---|---|
| Dummy Data | Dummy Data | Dummy Data |
| Dummy Data | Dummy Data | Dummy Data |
| Dummy Data | Dummy Data | Dummy Data |
Comprehensive Annual Maintenance Contract for 25 KV AC microprocessor control IGBT based 3-phase Propulsion Systems and equipment for ICF make MEMU Rolling Stocks for three years at MEMU Car Shed/Khurda Road with M/s Bharat Heavy Electricals Limited.
Procurement of GE BENTLEY make TSI SPARES for Main Turbine TDBFP MDBFP of 2800MW NTPCLara Project