Loading...
REPAIR MAINTENANCE OF DEFECTIVE PARTS OF ELECTRICAL OPERATED PASSENGER LIFTS INSTALLED AT P 51 AND 62 AT PIRU VIHAR UNDER GE U P AND M DELHI CANTT
| Category | Parameter | Value |
|---|---|---|
| Dummy Data | Dummy Data | Dummy Data |
| Dummy Data | Dummy Data | Dummy Data |
| Dummy Data | Dummy Data | Dummy Data |
AOH kit
Set of Kit for Pressure Control Valve as per FTRTIPL Part No.790033105 Qty. 03 Nos kit (kit 1 & 2 consisting 7 items in each and kit No.3 consisting of 13 items) as per attached annexure.