Loading...
Uttar Pradesh Power Corporation Limited is executing the dismantling, shifting, and replacement of a 220/132KV 160 MVA transformer with a new 200 MVA unit at the 220KV substation in Moradabad under ETD-II project. The Aditya make transformer will also undergo erection at the same location.
| Category | Parameter | Value |
|---|---|---|
| Dummy Data | Dummy Data | Dummy Data |
| Dummy Data | Dummy Data | Dummy Data |
| Dummy Data | Dummy Data | Dummy Data |
The tender involves the supply, installation, testing, and commissioning of a GPS Master Clock System, along with synchronization of protection relays, disturbance recorders, and other IEDs at the 220/66 kV Kharadpada Substation in DNH.
Annual Zonal Contract - Kazipet (Excluding) to Garla (Including) and Microwave station near Kesamudram. (for the Period 01.07.2026 to 30.06.2027).