Loading...
Oil and Natural Gas Corporation Limited requires a vendor to fabricate and supply CPVC U Bend assemblies and unions for ICW Chlorinator Electrolyser Tanks, based on provided samples and scope of work.
| Category | Parameter | Value |
|---|---|---|
| Dummy Data | Dummy Data | Dummy Data |
| Dummy Data | Dummy Data | Dummy Data |
| Dummy Data | Dummy Data | Dummy Data |
Set of material for sander Flange Arrangements
COMPRESSOR AIR GEAR TRAIN 636C.