Loading...
Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - 3x210MW ATPS ANPARA; Deployment of radiography team with Gamma radiography camera for radiography shots Phased Array Ultrasonic Testing PAUT of HP joints and Insitu inte..
| Category | Parameter | Value |
|---|---|---|
| Dummy Data | Dummy Data | Dummy Data |
| Dummy Data | Dummy Data | Dummy Data |
| Dummy Data | Dummy Data | Dummy Data |
Limit Switch for Vande Bharat Train.
Re-alignment of cable trench cover plates of Dankuni Loco Works of CLW, Dankuni.