Loading...
Relining of various Rubber lined Chemical Storage / Measuring Tanks installed in Chemical Division at 2 x 600 MW, RGTPP, Khedar, Hisar.
| Category | Parameter | Value |
|---|---|---|
| Dummy Data | Dummy Data | Dummy Data |
| Dummy Data | Dummy Data | Dummy Data |
| Dummy Data | Dummy Data | Dummy Data |
TRANSPORTATION OF BULK PETROLEUM PRODUCTS BY TOP LOADING TANK TRUCKS Ex. MughalsaraiTerminal
EXPRESSION OF INTEREST OF EQUIPMENT FOR SETTING UP A 2MWh CELL FABRICATION LINE FOR CYLINDRICAL AND PRISMATIC CELLS SUPPLY, INSTALLATION, COMMISSIONING, DEMONSTRATION, TESTING, TRAINING OF 2MWH CELL FABRICATION LINE