Rectification and restoration of major electric power fault and replacement of main power cable from main substation LT panel to back side of Caretaker room Sub - Distribution panel (for MPCM Hall, Main Director Bldg ....in the GPO complex, Kolkata)
| Category | Parameter | Value |
|---|---|---|
| Dummy Data | Dummy Data | Dummy Data |
| Dummy Data | Dummy Data | Dummy Data |
| Dummy Data | Dummy Data | Dummy Data |
Vijayawada Division: Signal and Telecom Department: S&T works in connection with 1. Provision of MSDAC for Dual detection to existing track circuits on Road 1,4,6 (Goods loop.1) and UP (Rd.2) & DN (Rd.3) main lines at Rajahmundry station of Vijayawada division. 2. Provision of MSDAC for Dual detection to existing track circuits on Road 1,5,6,7 and Bridge Nos 4A & 4 at Vijayawada station of Vijayawada division. 3. Provision for additional Trip Inspection facilities for electric locomotives at PTS/BZA of Vijayawada Division.
Part (A) Bhopal Division: Provision of One bay Cover Over Platforms of 13 stations in Bina-Guna section Mahadeokhedi (MDVK), Semarkheri (SRKI), Kanjia (KXB), Guneru Bamori (GVB), Pipraigaon (PIA), Rahatwas (RTWS), ORR, Hinotia Pipalkhera (HPKA), Ratikheda (RIKA), Shadhoragaon (SHDR), Pilighata (PIGT), Pagara (PGA) and Maban (MABN) stations.(With Electrical Work) Part (B) Heavy repair to old running room at Guna.