Loading...
Earthwork in excavation in trenches for laying underground pipelines including lowering and jointing of RCC pipes of various diameters air vent pipes alfalfa valves and pump stand pipes at four different sites
| Category | Parameter | Value |
|---|---|---|
| Dummy Data | Dummy Data | Dummy Data |
| Dummy Data | Dummy Data | Dummy Data |
| Dummy Data | Dummy Data | Dummy Data |
CONSTRUCTION OF AMS FACILITY (C 14 ANALYSIS) PHASE-II WORK AT CAP, SELAQUI, DEHRADUN
Fabrication of M.S structure for structural steel strengthening work of existing PH-I Monorail Beam OH crane, M.S Grills of various sizes for covering DLB Pittop mouth and manhole points of WTP for ensuring safe operation and maintainance purpose in