Loading...
The Indian Army has installed PVC roof panels, fall ceiling designs, and PVC wall panelling. They also set up automated blinds, an air conditioner with a voltage stabilizer, and completed electric wiring including points and lights. A smart 65-inch 4K TV was also installed for enhanced entertainment.
| Category | Parameter | Value |
|---|---|---|
| Dummy Data | Dummy Data | Dummy Data |
| Dummy Data | Dummy Data | Dummy Data |
| Dummy Data | Dummy Data | Dummy Data |
Contact wire parallel clamp
ELECTRICAL WORK IN SUB STORE HALL