Loading...
The Indian Army faces challenges with PTZ repair due to PCB issues and power supply problems, requiring thorough PCB repairs and stable power solutions.
| Category | Parameter | Value |
|---|---|---|
| Dummy Data | Dummy Data | Dummy Data |
| Dummy Data | Dummy Data | Dummy Data |
| Dummy Data | Dummy Data | Dummy Data |
Annual Maintenance Contract for stand-by DG Sets ranging from 2.4 KVA to 250 KVA capacities installed at various locations over the Kharagpur Division for a period of 3 years under Sr.DEE(G)/KGP.
The tender involves pole shifting and transformer shifting for the Sarraiya Basthan road in Janpad, Gorakhpur, Uttar Pradesh, India. The total estimated value of the work is Rs 16.4 million INR.