Loading...
Provision of single connection arrangement at the input of MPCB/MCB instead of existing looping arrangement in all LHB type EOG/HOG AC Coaches & Power Cars of all coaching depots & workshops of N.F. Railways.
| Category | Parameter | Value |
|---|---|---|
| Dummy Data | Dummy Data | Dummy Data |
| Dummy Data | Dummy Data | Dummy Data |
| Dummy Data | Dummy Data | Dummy Data |
Overhauling of Co-Co Flexi-Coil Mark IV High Adhesion Bogies of WAP7/WAG9-HC Locomotives for a period of two (02) years at Loco Shed Hubli
Repair and overhauling of Axle Mounted Disc Brake System of LHB Coaches SS-II & SS III Schedule - Faiveley make of MYSS and UBLS of SOUTH WESTERN RAILWAY