Loading...
Providing Foundation for Fencing, Structural Steel Roofing, Weld Mesh Fixing, and Protective Painting Works for Chiller Plants 1 and 2 at UAB Campus
| Category | Parameter | Value |
|---|---|---|
| Dummy Data | Dummy Data | Dummy Data |
| Dummy Data | Dummy Data | Dummy Data |
| Dummy Data | Dummy Data | Dummy Data |
CONSTRUCTION OF AMS FACILITY (C 14 ANALYSIS) PHASE-II WORK AT CAP, SELAQUI, DEHRADUN
Fabrication of M.S structure for structural steel strengthening work of existing PH-I Monorail Beam OH crane, M.S Grills of various sizes for covering DLB Pittop mouth and manhole points of WTP for ensuring safe operation and maintainance purpose in