Loading...
NTPC Limited is seeking to procure Toothed Rim Assembly (SR-2) and Crusher Gearbox for their CHP at the Simhadri Super Thermal Power Plant. The procurement is managed by DGM USSC (C and M).
| Category | Parameter | Value |
|---|---|---|
| Dummy Data | Dummy Data | Dummy Data |
| Dummy Data | Dummy Data | Dummy Data |
| Dummy Data | Dummy Data | Dummy Data |
TRANSPORTATION OF BULK PETROLEUM PRODUCTS BY TOP LOADING TANK TRUCKS Ex. MughalsaraiTerminal
EXPRESSION OF INTEREST OF EQUIPMENT FOR SETTING UP A 2MWh CELL FABRICATION LINE FOR CYLINDRICAL AND PRISMATIC CELLS SUPPLY, INSTALLATION, COMMISSIONING, DEMONSTRATION, TESTING, TRAINING OF 2MWH CELL FABRICATION LINE