Bank of Baroda has implemented 10 KVA online UPS systems equipped with stationary valve regulated lead acid batteries conforming to IS standards. These systems ensure reliable power supply and compliance with industry regulations.
| Category | Parameter | Value |
|---|---|---|
| Dummy Data | Dummy Data | Dummy Data |
| Dummy Data | Dummy Data | Dummy Data |
| Dummy Data | Dummy Data | Dummy Data |
Vijayawada Division: Signal and Telecom Department: S&T works in connection with 1. Provision of MSDAC for Dual detection to existing track circuits on Road 1,4,6 (Goods loop.1) and UP (Rd.2) & DN (Rd.3) main lines at Rajahmundry station of Vijayawada division. 2. Provision of MSDAC for Dual detection to existing track circuits on Road 1,5,6,7 and Bridge Nos 4A & 4 at Vijayawada station of Vijayawada division. 3. Provision for additional Trip Inspection facilities for electric locomotives at PTS/BZA of Vijayawada Division.
Part (A) Bhopal Division: Provision of One bay Cover Over Platforms of 13 stations in Bina-Guna section Mahadeokhedi (MDVK), Semarkheri (SRKI), Kanjia (KXB), Guneru Bamori (GVB), Pipraigaon (PIA), Rahatwas (RTWS), ORR, Hinotia Pipalkhera (HPKA), Ratikheda (RIKA), Shadhoragaon (SHDR), Pilighata (PIGT), Pagara (PGA) and Maban (MABN) stations.(With Electrical Work) Part (B) Heavy repair to old running room at Guna.