Loading...
Old Brick on Edge Lining work at Main Canal with 40 Percentage new and old Brick From 0.000 k.m. to 0.700 k.m 700 Mtr as L Sec and X Sec for up Lifting of bed and Uprooting, strengthening of embankment at Lanagri Pump Canal Basti
| Category | Parameter | Value |
|---|---|---|
| Dummy Data | Dummy Data | Dummy Data |
| Dummy Data | Dummy Data | Dummy Data |
| Dummy Data | Dummy Data | Dummy Data |
Construction of Sump, Pump house and pumping arrangements for divertion of drain water to pr Canal contamination at Km 21.80 near Konda Koppaka village - Reach-III
Construction of new RCC double vent Sluice gate