Loading...
Emergent Maintenance work of the existing road of the project Construction of 4Lane Bridge over Irang River on Imphal-Jiribam road section 95.5Km NH37 on EPC mode at the Risk Cost of the EPC Contractor on Percentage Rate and work Order Basis 3rd Call
| Category | Parameter | Value |
|---|---|---|
| Dummy Data | Dummy Data | Dummy Data |
| Dummy Data | Dummy Data | Dummy Data |
| Dummy Data | Dummy Data | Dummy Data |
Clindamycin Gel 1% w/w, At least 10gm
STUD ASSLY