Loading...
The tender involves lifting and lowering two 600 GPM 180 HP 2900 RPM 8 stage Pullen Make submersible pumps and 15 six-inch diameter pipes at a mine in Amal. Joyra due to pump breakdown and pipe damage.
| Category | Parameter | Value |
|---|---|---|
| Dummy Data | Dummy Data | Dummy Data |
| Dummy Data | Dummy Data | Dummy Data |
| Dummy Data | Dummy Data | Dummy Data |
Dry magnetic powder
ALL STEEL LOCK NUT FOR WAG-9