Loading...
Laying of joining of 40mm dia HDPE pipe line work at OUT Kandiguda part ward-14 kapra circle-7 kapra, Uppal Zone, MMC for the year 2026-27
| Category | Parameter | Value |
|---|---|---|
| Dummy Data | Dummy Data | Dummy Data |
| Dummy Data | Dummy Data | Dummy Data |
| Dummy Data | Dummy Data | Dummy Data |
Aluminium flat moulding size 50 x 2.5 mm thick x 3660 mm long. LLH/SK-25/80, Item 20,Alt -12. Material, Anodization and Protective covering as per drawing.
Supply of Lavatory flooring items of LHB coaches.