Loading...
FUEL FILTER WATER SEPRATOR,REAR SHOCK ABSORBER ASSY,REGULATOR 24 V,PRESSURE PLATE,CLUTCH PLATE,CHAIN SPROCKET SET,WIRING HARNESS
| Category | Parameter | Value |
|---|---|---|
| Dummy Data | Dummy Data | Dummy Data |
| Dummy Data | Dummy Data | Dummy Data |
| Dummy Data | Dummy Data | Dummy Data |
This tender is for overhaul works on boiler pressure parts including replacement of eroded tubes and metal filling at Dr.MVR RTPP Unit-6 during the 2026-27 annual overhaul period. The scope includes inspection, fixing, and adjustment of erosion protection shields. The work is managed by APGENCO-CE -O&M- RTPP.
A/R M/o to MPs flats/bungalows under Sub div-II of PaWD-I dg. 26-27 SH: Providing services of supervisor and helper for section-I