Loading...
The project seeks expressions of interest for the development, operation, and maintenance of a 200 MW solar battery energy storage system located at the Siddeshwar dam. This initiative falls under the works category and is specifically related to solar power plants.
| Category | Parameter | Value |
|---|---|---|
| Dummy Data | Dummy Data | Dummy Data |
| Dummy Data | Dummy Data | Dummy Data |
| Dummy Data | Dummy Data | Dummy Data |
Tender for supply of 1 Pocket Plate Battery Bank, 240AH. Bid end date is 31-07-2026 12:00:00 and opening date is 31-07-2026 12:30:00. Evaluation method is total value wise evaluation.
Design, Supply, Installation, testing & commissioning of 3.0 MW/ 6.0 MWh Battery Energy Storage System at BLW Premises.