Loading...
The Indian Army has implemented a 1.5 KVA duct air cooler with a flow rate of 25,000 cubic meters per hour to enhance cooling efficiency in their facilities. This solution ensures optimal temperature control for various operations and personnel comfort.
| Category | Parameter | Value |
|---|---|---|
| Dummy Data | Dummy Data | Dummy Data |
| Dummy Data | Dummy Data | Dummy Data |
| Dummy Data | Dummy Data | Dummy Data |
Engineers India Limited, a Central Govt. Ministry/Department, is seeking bids for 172 variable area flowmeters for the Bina Petchem and Refinery Expansion Project (BPREP). The project is located as per the bidding documents.
Supply and Commissioning of Boiler stack Emission Gas SPM,SOX,NOX Analyser 1 and ETP Water COD, BOD, TSS, pH Analyser 1No.