Loading...
Development of 187.50MW/750 MWh Battery Energy Storage System (BESS) through EPC mode at Choutuppal, Telangana, including 15 years of operation and maintenance.
| Category | Parameter | Value |
|---|---|---|
| Dummy Data | Dummy Data | Dummy Data |
| Dummy Data | Dummy Data | Dummy Data |
| Dummy Data | Dummy Data | Dummy Data |
The Indian Air Force utilizes a robust 10KVA, 160AH 48V VRLA battery bank to ensure reliable power supply for critical operations. This high-capacity battery system is designed to meet the stringent requirements of military infrastructure.
The product category includes a cover outer with dimensions 750x16 and ply types 12/14, along with a 12V 75Ah battery. This item is from HQIDS.