Loading...
NTPC Limited requires a custom bid for the breakdown and overhaul maintenance of 500MW pump motors at their facility in Kahalgaon. This service involves comprehensive repair and restoration of motor components to ensure optimal performance.
| Category | Parameter | Value |
|---|---|---|
| Dummy Data | Dummy Data | Dummy Data |
| Dummy Data | Dummy Data | Dummy Data |
| Dummy Data | Dummy Data | Dummy Data |
TRANSPORTATION OF BULK PETROLEUM PRODUCTS BY TOP LOADING TANK TRUCKS Ex. MughalsaraiTerminal
EXPRESSION OF INTEREST OF EQUIPMENT FOR SETTING UP A 2MWh CELL FABRICATION LINE FOR CYLINDRICAL AND PRISMATIC CELLS SUPPLY, INSTALLATION, COMMISSIONING, DEMONSTRATION, TESTING, TRAINING OF 2MWH CELL FABRICATION LINE