Loading...
CONSTRUCTION OF NEW OFFICE BUILDING (G PLUS 02 STOREY) AT ETP AT RCF THAL
| Category | Parameter | Value |
|---|---|---|
| Dummy Data | Dummy Data | Dummy Data |
| Dummy Data | Dummy Data | Dummy Data |
| Dummy Data | Dummy Data | Dummy Data |
Jeypore-Malkangiri New BG Railway Line: Design & Construction of New BG Railway line from KM 41.50 to Km 69.60 (including Nunkhari Station) involving Earthwork in formation, Embankment/Cutting, Blanketing, Side Drains, Catch Water Drains, Minor Bridges, Major Bridge, Road Under Bridge (RUBs), Viaducts, Tunnels, Protection works, BLT works, P.Way Track works with Contractor s own materials (except New/SH Rails), construction of Platforms, Station Buildings, Service Buildings, SP/SSP bu
Project Management consultancy for the work of Construction of 30 bedded (Upgradable up to 100 bed) ESIC Hospital at Chittorgarh, Rajasthan on deposit basis