Loading...
Const of p/work near shiv mandir at moh. Balliwala w no 3 Pyt Narayana Upper Block Khour- 02 lacs and const of p/work near h/o. Pawan kumar w.no.3 Pyt Narayana Upper Block Khour-1 lacs Pyt Narayana Upper Block Khour PRI Plan 2026-27 (Pyt Level)
| Category | Parameter | Value |
|---|---|---|
| Dummy Data | Dummy Data | Dummy Data |
| Dummy Data | Dummy Data | Dummy Data |
| Dummy Data | Dummy Data | Dummy Data |
(A) S&T works in connection with modification of Prayagraj Chheoki, Link junction and Naini Jn. yard layout. (B) Signaling work in connection with Provision of a crossover for provision of simultaneous movement at Link Junction station.
Construction of of Additional Classroom at Naktipadar PS