Loading...
Conducting of Topographical survey traffic census for a continuous period of 7days 7x24hrs with axle load survey and FWD Test in connection with the Strengthening work of Mirzapur Banshihari road SH10 from ch0.00km to 8.00km from 14.60km to 22.09km
| Category | Parameter | Value |
|---|---|---|
| Dummy Data | Dummy Data | Dummy Data |
| Dummy Data | Dummy Data | Dummy Data |
| Dummy Data | Dummy Data | Dummy Data |
Consultancy Services For Authoritys Engineer for Supervision of Work of Upgradation and Reconstruction of Sirmaur-Dabhaura Section of NH-135B from Km 36/700 to Km 73/813 to 2LPS Configuration in the State of Madhya Pradesh on EPC Mode
Permanent restoration of roads from Dagair to Panaya JK05-062, Shoara to Kamdhani JK05-79 and Chigal to Kathar JK05-103