Loading...
Balance work under Risk and Cost for Up gradation of Paithan Pategaon Mungi Hatgaon Bodhegaon Ladjalgaon Ghogaspargaon Phulsangvi Ukhandachakla Dahiwandi Shirur to 2 lane with paved Shoulder 4 lane Configuration Package 55 937 Km for
| Category | Parameter | Value |
|---|---|---|
| Dummy Data | Dummy Data | Dummy Data |
| Dummy Data | Dummy Data | Dummy Data |
| Dummy Data | Dummy Data | Dummy Data |
Day-to-day minor/ miscellaneous repair/ maintenance and allied works of various buildings/ structures and plinth protection work at some places at CWS Colony under CWS Tadali
ICU Ventilators (V2),ICU Ventilators (V2)