The project involves constructing a path drain from Nazir to Masjid Sharief, Ward No. 5, Pyt. Donugam Block Mandi under the PRI grant for the year 2026-27. The total estimated value of the project is Rs 168,000.00.
| Category | Parameter | Value |
|---|---|---|
| Dummy Data | Dummy Data | Dummy Data |
| Dummy Data | Dummy Data | Dummy Data |
| Dummy Data | Dummy Data | Dummy Data |
Utility shifting works comprising dismantling and construction of station buildings at Pilol and Limkheda; Foot Over Bridges (FOBs) at Pilol, Samlaya, Piplod, Limkheda, Champaner and other stations; quarters at Chhayapuri, Bakrol, Samlaya, Dahod, Limkheda, Rentia and other locations; tool rooms; S&T auto huts at various stations and in the section; and other miscellaneous works in the Vadodara-Dahod section in connection with the quadrupling project between Vadodara and Ratlam (258.94 km) on Western Railway.
DEN/South/SBC sec : Hosur : Proposed construction of Running room at Hosur (20 Beds) under ADEN/Dharmapuri Sub-Division. Maintenance period is 3 years