Loading...
AA7521408128_ GATE VLV CS(A216WCB) 6" CL150 FLNGD RF,AA7521408080_ GATE VLV CS(A216WCB) 3" CL150 FLNGD RF,AA7501408122_ GLV CS NB 6" -PRCL 150 FLNG RF ASMEB16.34,AA7501408084_ GLV CS NB 3" -PRCL150 FLNG RF ASME B16.34
| Category | Parameter | Value |
|---|---|---|
| Dummy Data | Dummy Data | Dummy Data |
| Dummy Data | Dummy Data | Dummy Data |
| Dummy Data | Dummy Data | Dummy Data |
This tender is for overhaul works on boiler pressure parts including replacement of eroded tubes and metal filling at Dr.MVR RTPP Unit-6 during the 2026-27 annual overhaul period. The scope includes inspection, fixing, and adjustment of erosion protection shields. The work is managed by APGENCO-CE -O&M- RTPP.
A/R M/o to MPs flats/bungalows under Sub div-II of PaWD-I dg. 26-27 SH: Providing services of supervisor and helper for section-I