1) Supply, installation and commissioning of wheel load measurement in Electronic In-motion Weigh Bridges at CKNI and to be installed at Kayar. 2)Shifting of EIMWB from BPQ to Kayar including1.civil precast foundation 2. cable400 mts 3. cable conducting 4. Earthling of weigh in motion 03 Nos and track earthling 5. Supervision and installation charges 6. calibration and stamping
| Category | Parameter | Value |
|---|---|---|
| Dummy Data | Dummy Data | Dummy Data |
| Dummy Data | Dummy Data | Dummy Data |
| Dummy Data | Dummy Data | Dummy Data |
Mahalaxmi (EMU Workshop) - (1) Construction of Store for stacking and storing of materials. (2) Improvement to water supply network with realignment(Composite Tender).
Lower Parel (Workshop) - 1) Repairs to existing Boundary Wall by providing a new RCC boundary to safeguard the compound wall of workshop (2) Improvement to road & Pathway by provision of RCC road in Lower Parel workshop